Installation instructions
Compression fittings
The assembly instructions apply for all GOK compression fittings which meet the requirements of EN ISO 8434-1 and DIN 2353. The assembly of the compression fitting is described step by step in drawings.
The assembly instructions show the direct assembly as well as the pre-assembly in the VOMO preassembly tool socket with final assembly in the screw socket. Different materials for pipe and compression fitting - steel, copper or stainless steel - are also taken into account.
Hereby, the requirements on reliable assembly instructions are met according to the German DIN 3859-2 and DIN 3387-1.
Universal connectors type UA PS 16 bar
The universal connectors type UA correspond to a clamp connection of version G according to prEN 12514-4:2009 annex D. They are designed to connect a GOK fitting in oil firing installations with copper pipe diameter 6, 8 or 10 mm.
The assembly of the universal connectors is described step by step in drawings as a safe clamping ring connection.
Viega Profipress G
User information for installing the piping system.
Description of the product and function as well as instructions for a proper installation.
Information is provided by Viega for publication on our website. You will find further information about this product at www.viega.co.uk.